AS 2017 Volume 24 Issue 2
Permanent URI for this collection
Browse
Browsing AS 2017 Volume 24 Issue 2 by Author "Bekker, Michiel"
Now showing 1 - 1 of 1
Results Per Page
Sort Options
Item Open Access Building an infrastructure project performance in the North-West Province Department of Public Works and Roads(University of the Free State, 2017) Murwira, Davison; Bekker, MichielEnglish: Building and infrastructure projects at the North-West Province Department of Public Works and Roads (NW DPWR) often perform poorly in terms of overrunning both the original approved timeline and the budget. Adding to poor time and cost performances, these projects often do not meet the desired functional requirements. This article reports on findings of a study which investigated the causes of these poor performances in the NW DPWR. Fifty potential causes of poor performance were identified from literature. These factors were grouped under three main related categories of owner-related, contractorrelated and consultant-related and were subjected to a questionnaire survey to identify the most critical causes of failure. The results were analysed using the Relative Importance Index (RII) and Spearman’s Rank Correlation Coefficients. The results indicated that the most significant causes of poor building and infrastructure project performance in the NW DPWR include underestimation of project cost, the lack of experience in executing projects, contractor’s cash-flow constraints, corruption and bribery during the bidding and contract award phase, as well as poor site management and supervision. Recommendations are made to prevent similar causes of projects failure in the NW DPWR in future.